Workers on Launch Pad 39A perform checks on Endeavour's oxygen flex hose fitting through manual inspection and using helium detectors. Visual inspection found a deformity in the flex line braid where it connects to rigid tubing. The entire flex hose assembly and bulkhead fitting were removed early today, and work is under way to complete the installation of a replacement.