LST-G shippers--Nick Maiorelle and John A. Freer, prepare 430,000-kVA, liquid-cooled stator for rail shipment to Turkey Point Station, Florida Power and Light Company, located in Dade County, near Florida City, Florida. The 240-ton generator is part of unit no. 2 -- a 3600-rpm, TC4F, reheat steam-turbine-generator unit (type G2/4A4) -- 406,400-kW, STM, cnd. 2520/1000/1000 f. 26-in. LSB.
General Electric Company