Pamban Bridge - The one-off span to Rameshwaram

An engineering marvel of yesteryear, the Pamban Bridge is 103 years old and still counting.

View of the Pamban Bridge by Ravi SunderarajanRail Enthusiasts' Society

The Mandapam-Dhunshkodi/Rameshwaram rail line required a sea bridge to connect Rameshwaram island to the mainland. The solution was an “open-close” mechanism using the bascule bridge design concept. This is the span that has given uniqueness and a distinctive quality to the bridge that was built. This is the Pamban Bridge. Construction commenced in 1911 and the bridge was opened for traffic in February, 1914, with an meter gauge single line. The Pamban bridge, with 143 piers, is the second longest sea link in India after the 2.3-kms Bandra-Worli sea link on Mumbai's western coast. It is the first sea bridge in India and the 4th longest bridge in the country (length 2057 meters).

Pamban Bridge's spans lift for a ship to pass by Ravi SunderarajanRail Enthusiasts' Society

A bascule bridge or Scherzer span, is a moveable bridge with a counterweight that continuously balances a span/leaf, throughout its upward swing to provide clearance for boat traffic. It may be single or double leafed and Pamban bridge has two leaves.

Opening of the Pamban Bridge by Ravi SunderarajanRail Enthusiasts' Society

The Scherzer span can be opened and closed by cranking wheels which in turn rolls the curved structure on the horizontal platform.

Opening of the Pamban Bridge by Ravi SunderarajanRail Enthusiasts' Society

During the cranking operation for opening, the cantilever portion of with rail moves upwards and counter weight comes down.

A Scherzer span of Pamban bridge by Ravi SunderarajanRail Enthusiasts' Society

Typically, a bascule bridge span consists a curved structure (like roller) with a long span on one side and a counter weight on other side. Rails are mounted on the long span. The curved structure rests on a horizontal platform and can roll on this platform. The counter weight is heavier and at a higher level than the span and creates unstable equilibrium (by design) resulting in a rolling effect on the
Scherzer span. Thus, a natural upward lifting tendency is created on the span such that the span does not fall into the sea. On the Pamban bridge, the span weight is 184 tons and the counter weight itself is 234 Tons.

Ratchet brake mechanism of Pamban bridge by Ravi SunderarajanRail Enthusiasts' Society

To avoid the lifting up of span due to unstable equilibrium, the span is always kept in closed condition and ratchet mechanism (brakes) arrests upward lift of the span.

Brake and cranking lever of Pamban bridge by Ravi SunderarajanRail Enthusiasts' Society

In effect, the Scherzer span is a rolling cantilever bridge and the point on which the curved structure rests is the fulcrum.

Side view of Scherzer span from top by Ravi SunderarajanRail Enthusiasts' Society

The fulcrum location is dynamic and changes to various points on the horizontal platform whenever the Scherzer span is opened or closed.

Weight distribution of Pamban Bridge explained by Ravi SunderarajanRail Enthusiasts' Society

The outer pillars on which these platforms are fixed are specially designed to handle upward tensile forces created by vertical forces on the counter weight.

Weight dynamics during train movement on Pamban Bridge, explained by Ravi SunderarajanRail Enthusiasts' Society

During train movements, cumulative weight of rolling stock /loco and span weight exceeds the counter weight on the other side. This creates reversal effect is and vertical force is created on counter weight.

Diagonal reinforcement member post GC by Ravi SunderarajanRail Enthusiasts' Society

Measuring velocity, manually by Ravi SunderarajanRail Enthusiasts' Society

Longitudinal, lateral and vertical alignment are to be precise to ensure safe train operations.

Measuring velocity, manually by Ravi SunderarajanRail Enthusiasts' Society

Longitudinal alignments are adjusted by local engineering staff, while vertical alignment can be a real challenge.

Fan wellage, to lock spans and transfer weight by Ravi SunderarajanRail Enthusiasts' Society

Scherzer span has male/female inter locking mechanism (called Fan wellage) and while closing the span, bridge operator ensures that this securely locked.

A road bridge parallel to the rail bridge was built, in 1988 by Ravi SunderarajanRail Enthusiasts' Society

On the night of December 24, 1964, a super cyclone struck the area and the Pamban-Dhunskodi Passenger was washed away by a tidal wave killing all the occupants (around 115 passengers) on the way to Dhanushkodi. The cyclone caused many girders of Pamban bridge to be washed away but the Scherzer span withstood its fury.

View from the side of Pamban bridge by Ravi SunderarajanRail Enthusiasts' Society

After 1964 super cyclone, Pamban- Dhunskodi line was not restored and the village Dhunskodi was declared "unfit for living” by the Madras government.

Credits: Story

Author: Ravi Sunderarajan

Credits: All media
The story featured may in some cases have been created by an independent third party and may not always represent the views of the institutions, listed below, who have supplied the content.
Explore more
Related theme
Indian Railways
151,000 km of laid track, 1 billion people, and an infinite source of memories
View theme
Home
Discover
Play
Nearby
Favorites