Between the late 19th and early 20th centuries, Portugal experienced a "madness" in railway construction, with numerous ideas for new routes, many of which never left the drawing board. The connection between Régua and Lamego was one of these ambitions, with its first preliminary study presented in 1886 by Emídio Navarro and completed in 1888.
The proposed law, authored by Emídio Navarro and Mariano Carvalho, envisioned the construction of a narrow-gauge (meter gauge) railway line connecting Vidago to Vila Franca das Naves, passing through Lamego, over a distance of 193 kilometers.
Plan with longitudinal section of the railway line relating to the Régua-Lamego section (1911) by UnknownOriginal Source: Museu do Douro collections
The design of an ambition: The Line Plan
This 1911 technical plan details the 18.6 km Régua-Lamego section. The document is proof of the rigor of Portuguese engineering, marking each bridge, station, and planned gradient to overcome the harsh geography of the Douro.
This project was included in the National Plan of 1900, but doubts arose early on regarding the viability of the section between Régua and Lamego due to the enormous difference in elevation between the two towns and the need to build a bridge over the Douro River. Solutions were considered involving smaller radius curves (up to 60 meters) and the use of a rack and pinion system to reduce costs and facilitate traction.
Despite successive advances and setbacks, and new authorizations, such as the 1920 law that allowed the Lamego City Council to build an electric railway, the works would only advance near the end of the 1920s. The final route, approximately 19 kilometers long, would be quite winding, with tight curves and steep gradients, starting at the Régua station and curving south towards a new bridge over the Douro River.
Tap to explore
The "plan" in the Douro Museum
The railway line plan can be seen on the ground floor of the Douro Museum, integrated with other objects that tell the story of the railway in the Douro region. In this spacious and contemporary setting, the technical drawing transforms into a visual narrative of the Douro.
Tap to explore
Starting point: Régua Station
Since the 19th century, Régua station revolutionized the Douro by replacing river transport with rail. This shift enabled the rapid, efficient distribution of Port wine to the world, overcoming geographic barriers and turning the region into a global export hub.
The history of the railway line to Lamego is intrinsically linked to Régua Station. Inaugurated on July 15, 1879, as part of the construction of the Douro Line, the station became the natural starting point for a future connection to the left bank of the Douro River. Initially, the connection between Lamego and Régua was made by stagecoach, on a difficult route along the old royal road, which passed over the medieval Varosa bridge.
Passengers suffered from a lack of seats, often traveling on top of their luggage, while the transport of goods, dependent on animal traction, was equally difficult. The need for a rail link was thus becoming increasingly urgent.
Departure of a train carrying Port wine (1933/1949) by Fotografia AlvãoOriginal Source: Museu do Douro collections
Decades later, with construction already underway, Régua station served as a storage facility for track material, such as "tirefonds," acquired by the Government in the 1930s, awaiting the moment to be placed on the platform of the new line.
Tap to explore
Crossing the Douro River: the Régua Bridge
To begin the journey towards Lamego, the line would have to cross the Douro River. The crossing took place in the area where the Régua road bridge is located today, a strategic point connecting the two banks of the river.
The first major challenge of the project was crossing the Douro River. Construction of the bridge began in 1927, designed by Engineer Avelar Ruas and overseen by Engineer Maçã Fernandes, and was completed in 1933. The choice of stone over iron, a more common material at the time, reflected a trend towards economy and durability, similar to what was done by the Vouga Valley Company.
The bridge is 330 meters long, spanning the riverbed with three central arches spanning 65 meters and seven lateral arches spanning 12 meters, with the structure lightened by smaller arches between the larger ones.
Construction of the Arch of the Régua Bridge (1925-01-01/1932-12-31) by Fotografia AlvãoOriginal Source: Portuguese Photography Center
This bridge, which was never intended to be crossed by a train, ended up being adapted for road traffic. The widening of the deck, to allow for a road and sidewalks, was designed by engineer Edgar Cardoso, guaranteeing it a new function and utility that endures to this day.
Tap to explore
Drilling the mountain: trenches and cuts in the rock
After crossing the valleys, the branch line's route required a gradual ascent of the slopes leading to Lamego. To allow the railway to pass, deep cuts were excavated in the rock, known as railway trenches.
After crossing the Douro River, the line began the difficult climb towards Lamego, overcoming the rugged terrain. Work progressed along the slopes, with the opening of trenches, the construction of embankments and retaining walls, and the preparation of the track bed. This earthwork, essential to create a stable bed for the rails, represented a considerable effort and left deep marks on the landscape.
Much of this effort was not in vain, as many of these sections, with the trenches and embankments already opened, were later used to create roads and access paths to the towns, making it easy to identify, even today, where the train should have passed.
Tap to explore
Conquering the Varosa Valley: The Varosa Bridge
After crossing the Douro River, the branch line continued towards the Varosa River valley. At this point, another fundamental engineering project was planned: the bridge over the Varosa.
Another significant obstacle along the route was the Varosa River valley. To overcome it, another imposing stone structure was built: the Varosa Bridge. Measuring 148.60 meters in length, this bridge curves and consists of a 55-meter arch span and a 40-meter span.
Side view of the Varosa Bridge under construction (1931-01-01/1932-12-31) by Fotografia AlvãoOriginal Source: Portuguese Photography Center
The ceremony to dismantle its arch, on October 20, 1932, was attended by individuals connected to the railway company and the Government, in a moment of optimism regarding the completion of the line. The works, which at one point employed nearly 300 workers.
The bridge continues to connect the two banks of the Varosa River, awaiting a future that will preserve it as a reminder of the effort invested in the ambitious railway link.
Tap to explore
Imagined destination: Lamego
The branch line's final destination would be the city of Lamego, one of the most important historical centers in the Douro region. The rail link promised to strengthen regional mobility and bring the city closer to the main transport hubs.
The final destination, Lamego, had been envisioned and prepared for decades. In May 1909, the land for the station was reserved. Later, in 1926, part of the walls of the old Episcopal Palace were demolished to prepare the site, and several projects for the passenger building were presented. Everything seemed to be on track for the line to be completed, but the world and the country had changed.
Designs for the facade of the Lamego Railway Station (1934-05-16) by Gazeta dos Caminhos de FerroMuseu do Douro
National Road 2 shortened the distance between Régua and Lamego to 15 kilometers, compared to the 19 kilometers planned for the winding railway route. The appearance of buses from the Vale do Vouga Company, which in 1930 made the connection in 25 minutes, made the future train, slow and with an uncompetitive route, an economically unviable option with a budget deficit. Pressure from road operators and the outbreak of World War II in 1939 dictated the definitive end of the project.
Tap to explore
The Station Place
The site envisioned for the station is now occupied by the courthouse, and the line, which never saw a train pass, left only traces on the ground and the memory of a railway ambition that road progress rendered obsolete.
Photographs: Alvão Photography Collection; Noel Magalhães; Rui Monteiro
Texts: Rui Monteiro (Faculty of Arts, University of Porto)
Inventory: Enara Teixeira, Natália Fauvrelle, Susana Marques (Douro Museum); Rui Monteiro (FLUP)
Layout: Natália Fauvrelle (Douro Museum); Rui Monteiro (FLUP)
Translation: Rui Monteiro (FLUP)